System Details

Total DC Rating

734 kW

Total AC Rating

500 kW

Project Description

The Thurston East array is part of a 4-installation parent project, Bennington, boasting a 734 kW ground-mounted solar array in Orange, Vermont. The project became operational in 2017 and provides clean solar energy directly to the Barre Housing Authority (BHA).