7.1 MW
5 MW
4000
8000
Syncarpha’s Carver solar project is a 7.1-megawatt, ground-mounted solar facility constructed in Carver, Massachusetts. The project became operational in November 2024 and produces clean energy for approximately 350 low-income residents receiving electricity through Eversource.
Situated within a 765-acre parcel leased from E.J. Pontiff Cranberries Inc., the project supports a dual-purpose land strategy that integrates clean energy development with the preservation of Massachusetts’ agricultural landscapes.
The battery storage component also enhances the project’s impact by storing excess solar energy and releasing it during peak demand periods, a key feature under the Massachusetts Clean Peak program. Syncarpha’s Carver project will thus play an active role in stabilizing the local grid, reducing reliance on fossil fuels, and contributing to Massachusetts’ clean energy goals.
Visit our community solar website to see if you qualify for renewable energy savings.